It also helps verify they operate in compliance with the Owner’s Project Requirements (OPR). As a result, a building that’s been properly commissioned has been shown to have better overall quality and consistency of construction, reduced occupant complaints, and fewer warranty issues.

One of the key factors driving demand for building commissioning is a desire to meet rigorous energy efficiency (972) 818-9000 and performance requirements set forth by rating systems such as LEED®. This is often achieved through a combination of high-efficiency gas, water, electric and lighting equipment as well as sophisticated air and moisture control systems. However, this isn’t achievable without rigorous design and construction quality assurance and verification. Building Commissioning can provide this through a systematic and comprehensive approach to building systems testing and documentation.

As part of the process, a project’s design professional and installation contractor are responsible for ensuring that all systems are properly installed during the construction phase (acceptance testing).However, a building’s commissioning agent serves as a second set of eyes and ears through all phases of the project, ensuring the system is operating as intended after it’s been completed building commissioning and prior to occupancy.

In addition to reducing project schedule and costs with fewer change orders, building commissioning can help uncover issues that might surface as expensive maintenance or safety problems later on, such as temperature extremes, humidity extremes, airspeed from , unpleasant odors and lack of comfort. Typically, these types of issues are costly to fix and can be disruptive.

Depending on the project, a commissioning scope can start during the design phase and be documented in the basis of design. It can also require special bidding requirements during contractor selection and be coordinated with the static and dynamic testing that’s based on acceptance. Additionally, the construction team will need to be provided with a set of red-line drawings for commissioning, and methods of gathering test results need to be established, whether through data logging systems or manually recorded.

Once a new building has been commissioned, it can also benefit from ongoing commissioning (also known as “re-commissioning”).This involves periodic testing and documentation of existing systems to make sure United States of America they’re still functioning as expected.It can also Rirchardson help 1651 N Glenville Dr. Ste 201 to identify any potential energy savings opportunities.

In the past, commissioning primarily focused on mechanical systems and their controls, and energy usage was an important target. Now, we’re recognizing the need to consider more holistically how systems interact to deliver safe, healthy, environmentally responsible and affordable facilities that operate at minimum cost and maximum efficiency. The key to these goals is a thorough understanding of what constitutes the best practices in building commissioning


Building Commissioning Is A Process That Ensures All The Components Of A Building’s Systems (fr ...